Lodoyo II HEPP Feasibility Study

According to an existing operation data, that Lodoyo HEPP can operate continually during 24 hours a day, 12 month a year and only stop when there is periodically maintenance activity.
Water volume exploited to generate energy equal to 4,5 MW with mean produce 38 GWH per year. As known, it still take around 40 % from total output Barricade Lodoyo debit. But in fact, the requirement of primary energy increases year to year, and frequently we had deficit for the system of Java Bali electrics network.
Based on that reasons above, we made an analysis of barricading Lodoyo. The study divided into three aspects that are: operational, environmental and financial.
Operational analysis explain about historical water resource potency, exploited and castaway water resource. Not only that, we also made simulation of exploiting energy if in that area attached by a generating plant. And next, financial analysis explain about elegibility if in that area will build a project., by using standard method.
Last but not least, environmental analysis explain about condition of environment from some aspect.From the three analysis, It can be concluded that it is feasible to establish a generation plant using the potential of unuse water resources.